Project Overview
This project involved installing a new electrical service line to address voltage drop issues caused by long transmission distances in a multi-phase residential property. The existing setup limited the home's electrical capacity and future expansion potential.
Working through wooded terrain and across difficult landscape conditions, the new line was installed while minimizing disturbance to the surrounding environment. The upgrade allows the homeowner to expand electrical usage while improving efficiency and reliability.

